翻訳と辞書
Words near each other
・ Risk inclination formula
・ Risk inclination model
・ Risk Information Exchange
・ Risk intelligence
・ Risk International
・ Risk IT
・ Risk limiting post-election audit
・ Risk management
・ Risk Management (magazine)
・ Risk Management Agency
・ Risk Management Authority (Scotland)
・ Risk Management Exchange
・ Risk management framework
・ Risk management in Indian banks
・ Risk management information systems
Risk management plan
・ Risk Management Programme
・ Risk management tools
・ Risk Matrix
・ Risk measure
・ Risk metric
・ Risk neutral
・ Risk of infection
・ Risk of loss
・ Risk of Missed PRRS PCR Detection
・ Risk of mortality
・ Risk of Rain
・ Risk of ruin
・ Risk panel
・ Risk parity


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Risk management plan : ウィキペディア英語版
Risk management plan
A Risk Management Plan is a document that a project manager prepares to foresee risks, estimate impacts, and define responses to issues. It also contains a risk assessment matrix.
A risk is "an uncertain event or condition that, if it occurs, has a positive or negative effect on a project's objectives."〔PMBOK Guide 5th Edition, Glossary pg. 373.〕 Risk is inherent with any project, and project managers should assess risks continually and develop plans to address them. The risk management plan contains an analysis of likely risks with both high and low impact, as well as mitigation strategies to help the project avoid being derailed should common problems arise. Risk management plans should be periodically reviewed by the project team to avoid having the analysis become stale and not reflective of actual potential project risks.
Most critically, risk management plans include a risk strategy. Broadly, there are four potential strategies, with numerous variations. Projects may choose to:
* Avoid risk — Change plans to circumvent the problem;
* Control/Mitigate risk; — Reduces impact or likelihood (or both) through intermediate steps;
* Accept risk — Take the chance of negative impact (or ''auto-insurance''), eventually ''budget'' the cost (e.g. via a contingency budget line);
* Transfer risk — Outsource risk (or a portion of the risk - S''hare risk'') to third party/ies that can manage the outcome. This is done e.g. financially through insurance contracts or hedging transactions, or operationally through outsourcing an activity.
(Mnemonic: SARA for Share Avoid Reduce Accept, or A-CAT for "Avoid, Control, Accept, or Transfer")

Risk management plans often include matrices.
The United States Department of Defense, as part of acquisition, uses risk management planning that may have a Risk Management Plan document for the specific project. The general intent of the RMP in this context is to define the scope of risks to be tracked and means of documenting reports. It is also desired that there would be an integrated relationship to other processes. An example of this would be explaining which developmental tests verify risks of the design type were minimized are stated as part of the Test and Evaluation Master Plan. A further example would be instructions from 5000.2D 〔SECNAVINST 5000.2D 3.4.4.1 https://acc.dau.mil/CommunityBrowser.aspx?id=44705&lang=en-US〕 that for programs that are part of a System of systems the risk management strategy shall specifically address integration and interoperability as a risk area. The RMP specific process and templates shift over time (e.g. the disappearance of 2002 documents Defense Finance and Accounting Service / System Risk Management Plan, and the SPAWAR Risk Management Process).
== See also ==

* Risk management
* Project management
* Project Management Professional
* Event chain methodology